Power Generation, Transmission & Distribution Training System with Power Analyzer

Model: LT-P20

Brand: L-TEK

Country of origin China

Description

1-phase power line (Min): 0.08MΩ, Ο.ΙΝΩ, Ο.ΣΝΩ, ΙΜΩ, 10ΜΩ, 100ΜΩ, 200ΜΩ, ΟΡΕΝ; 3-phase power line (Min): L1: 0.2ΜΩ, 0.5ΜΩ, ΙΜΩ, 10ΜΩ, 100ΜΩ, 200ΜΩ, 500ΜΩ, ΟΡΕΝ; L2 (Min): 0.3MQ, 0.75ΜΩ, 2 ΜΩ, 20ΝΩ, 150ΜΩ, 300ΜΩ 400ΜΩ, ΟΡΕΝ; L3 (Min): 0.09ΜΩ, 0.1ΝΩ, 0.2ΜΩ, 100, 10ΜΩ, 100ΜΩ, 200ΜΩ, ΟΡΕΝ

Ground resistance

Must have 2-point earth test facilities: Water pipe: 7.52, heater: 102, gas pipe: 32, radiator: 1002, motor: 100; Must have 3- point earth test facilities: 10, 20, 30, 52, 7.50, 100, 300, 1102

Auxiliary earth resistance: 0~10k0 (Variable)

Ground rod: PE1/PE2/P1/P2/P3/C1/C2

Ground voltage: 0V/6V/9V (selectable); Phase test point: U(L1), V(L2). W(L3)

Leakage current load

R-Load1:1 k0, 100, 1000, 200ΚΩ, 300 ΚΩ, ΟΡΕΝ

Leakage current (R-load2): 30mA, 15mA, 2mA, 1mA, 0.4mA, 0.2mA, 0.1 mA, OPEN

Leakage C-load: 0.033, 0.01, 0.001, OPEN

DC voltage output: 0V, 5V, 12V, 24V (max. IA)

Electric leakage circuit breaker: 1-phase 15A/30mA: 3ea or more

Circuit breaker: 3-phase 4-wire 10A: lea, 3-phase 3-wire 10A: lea or more

AC output socket: 1-phase: 2ea (outlet 1 & 2),

3-phase 4-wire +PE: lea (outlet 3)

Input voltage: 1-phase 220V ±15% (50/60Hz),

3-phase 380V ±15% (50/60Hz) 4-wire (L1/L2/L3/N)

Accuracy: IEE687 Class 1.0 or Better

Communication: Must have RS-485 MODBUS/DNP3.0/Lon works.

Must have minimum following measurement facilities in the system: Phase voltage, line voltage, current, power, active power, reactive power, apparent power, power

factor and frequency

GET QUOTE

Please fillup this form correctly, we will contact with you as soon as possible